Se pare că ne vizitați din United States, însă site-ul actual pe care l-ai selectat să-l vizitați este din Romania. Doriți să schimbați site-ul?

Da, vă rog. Nu, doresc să rămân pe site-ul actual.

Enable high contrast mode

Barrier™ Ti maintenance video series

Quick tutorials on UV system maintenance

Ultraviolet lamps in a water disinfection plant

Barrier™ Ti UV system maintenance series overview

This video series provides a comprehensive guide to the installation, setup, and maintenance of the Barrier™ Ti UV system, ensuring safe handling, proper assembly, and optimal performance. The series covers every critical stage of the process:

Unboxing: Inspecting the packaging, verifying contents, and checking for damage before installation.

Mechanical & Electrical Installation: Correct positioning of the UV chamber and control panel, secure mounting, and proper electrical connections for reliable operation.

Lamp Replacement: Safe removal and installation of UV lamps using TWISTLOK+ components, including inspection and lamp hour counter reset.

Quartz Exchange: Step-by-step instructions for removing and replacing quartz thimbles, ensuring cleanliness and seal integrity.

Branch Rotation: Guidance on rotating and reinstalling the branch and lamp flange assembly to maintain alignment and sealing.

Barrier™ Ti UV system maintenance: Step-by-step video guides

Contact Us

Questions about your Barrier™ Ti UV System?