Case Study: Flower Mound, Texas
Engineering Assessment identifying problem areas of a critical water main to prioritize repairs, prevent failure and reduce risk
Like many fast-growing communities, the Town of Flower Mound, Texas lacked detailed information on the true condition of some key aging assets, including underground pipes and water mains. With the urgent assessment needed on a critical water main, Flower Mound wanted to make sure they have reliable information on this key asset.
Partnering with Xylem, Flower Mound used a condition-based engineering assessment approach that minimizes the risk of failure by identifying damaged pipes using advanced inspection technologies.