您似乎来自United States,但您选择访问的当前网站是China。是否更换网站?

是,请更换! 否,停在当前网站。

Enable high contrast mode

Xylem gets Dannemora Mine back in business

SWEDEN

Mining in the Dannemora iron ore mine in Sweden came to a halt in 1992 following a severe drop in the price of iron ore, which meant that the operation was no longer sustainable. In 2009, with the iron ore market prospering again, Dannemora Mineral AB began work to get the mine dry and back in operation. Xylem worked with Dannemora Mineral to rid the mine of water and ensure it remained water-free throughout its operation.